- Develop a Preliminary Design Schematic. Use a such as MultiSIM to construct an electronic schematic, if relevant, of any major functional blocks.
- Develop a flowchart for any major software component of the system (Must be detailed and ready to be programmed). Code of critical blocks of software may be submitted next week.
- Develop a on the components identified to date.
- Submit all the documents above alone with the documents compiled in the last assignment ofET410:
- Project Proposal
- Requirements Document
- System Design Review
- Final Schedule
- Final Budget