Technology Data Construction Center

Case 2 Energy+ Technology Data Construction Center

Ivan Smith, network administrator at Energy+ Technology (E+T), has been given the responsibility of implementing the construction of a large data center to a new office location. Careful planning is needed because E+T operates in the highly competitive petroleum industry. E+T is one of three national software companies that provide an accounting and business management package for oil jobbers and gasoline distributors. Some years ago, E+T jumped into the application service provider world. Their large data center provides clients with remote access to E+Ts complete suite of application software systems. Traditionally, one of E+Ts primary competitive advantages has been the companys trademark IT reliability. Due to the complexity of this project, Ivan will have to use a parallel method of implementation. Although this will increase project costs, a parallel approach is essential if reliability is not to be compromised.

Currently, E+Ts data center is located on the third floor of a vintage bank building in downtown Blue Lakes, Wisconsin. The company is moving to a new, in the recently developed industrial complex at the Wisconsin International Airport. On May 27, Ivan is formally assigned the task by the Vice President of Operations, Yan Calinow, with the following guidelines:

From start to finish, it is anticipated the entire project will take three to four months to complete.

It is essential that E+Ts 350 clients suffer no downtime.

Calinow advises Ivan to come back to the Executive Committee on June 15, with a presentation on the scope of the project that includes costs, first-cut timeline, and proposed project team members.

Ivan had some preliminary discussions with some of E+Ts managers and directors from each of the functional departments and then arranged for a full-day scopemeeting on June 1 with a few of the managers and technical representatives from operations, systems, facilities, and applications. The scope team determined the following:

Three to four months is a feasible project timeline and is $70,000$80,000 (this includes the infrastructure upgrade of the new site).

Critical to the no-downtime requirement is the need to completely rely on E+Ts remote disaster recovery hot site for full functionality.

Ivan will serve as project manager of a team consisting of one team member each from facilities, operations/systems, operations/telecommunications, systems & applications, and customer service.

Ivans Executive Committee report was positively received and, after a few modifications and recommendations, he was formally charged with responsibility for the project. Ivan recruited his team and scheduled their first team meeting (July 1) as the initial task of his project planning process.

Once the initial meeting is conducted Ivan can hire the contractors to renovate the new data center. During this time Ivan will figure out how to design the network. Ivan estimates that screening and hiring a contractor will take about one week and that the network design will take about two weeks. The new center requires a new ventilation system. The manufacturers requirements include an ambient temperature of 67 degrees to keep all of the data servers running at optimal speeds. The ventilation system has a lead time of three weeks. Ivan will also need to order new racks to hold the servers, switches, and other network devices. The racks have a .

The data center supervisor requested that Ivan replace all of the old power supplies and data cables. Ivan will need to order these as well. Because Ivan has a great relationship with the vendor, they guarantee that it will take only one week lead time for the power supplies and the data cables. Once the new ventilation system and racks arrive, Ivan can begin installing them. It will take one week to install the ventilation system and three weeks to install the racks. The renovation of the new data center can begin as soon as the contractors have been hired. The contractors tell Ivan that construction will take 20 days. Once the construction begins and after Ivan installs the ventilation system and racks, the city inspector must approve the construction of the raised floor.

The city inspector will take two days to approve the infrastructure. After the city inspection and after the new power supplies and cables have arrived, Ivan can install the power supplies and run the cables. Ivan estimates that it will take five days to install the power supplies and one week to run all of the data cables. Before Ivan can assign an actual date for taking the network off line and switching to the hot remote site, he must get approval from each of the functional units (Switchover Approval). Meetings with each of the functional units will require one week. During this time he can initiate a power check to ensure that each of the racks has sufficient voltage. This will require only one day.

Upon completion of the power check, he can take one week to install his test servers. The test servers will test all of the primary network functions and act as a safeguard before the network is taken off line. The batteries must be charged, ventilation installed, and test servers up and running before management can be assured that the new infrastructure is safe, which will take two days. Then they will sign off the Primary Systems check, taking one day of intense meetings. They will also set an official date for the network move.

Ivan is happy that everything has gone well thus far and is convinced that the move will go just as smoothly. Now that an official date is set, the network will be shut down for a day. Ivan must move all of the network components to the new data center. Ivan will do the move over the weekendtwo dayswhen user traffic is at low point.

ASSIGNMENT

1.Generate a priority matrix for AETs system move.

2.Develop a WBS for Ivans project. Include duration (days) and predecessors.

3.Using a project planning tool, generate a network diagram for this project.

Note: Base your plan on the following guidelines: eight-hour days, five-day weeks except for when Ivan moves the network components over a weekend, no holiday breaks, July 6, 2020, is the project start date. Ordering Ventilation System, New Racks, and Power Supplies/Cables takes only one actual day of work. The remaining days are the time necessary for the vendors to fill and ship the order to Ivan. Assume that five days after the start of the Renovation of the Data Center that the raised floor will be ready for inspection.

formalities:

word count: 500

Harvard style bibliography

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more
1
Need assignment help? You can contact our live agent via WhatsApp using +1 718 717 2861

Feel free to ask questions, clarifications, or discounts available when placing an order.
  +1 718 717 2861           + 44 161 818 7126           [email protected]
  +1 718 717 2861         [email protected]